IFS-FESOMΒΆ

The planned HydroLand results for this configuration will cover the period from 1990 to 2049.

The indicator products (HydroLand aridity indicator, soil moisture deficit, and the discharge-based flood and drought indicators) are also planned for this configuration and will be produced when the HydroLand runs are processed.

For the currently published application overview, workflow, evaluation scope, and data products, refer to the main HydroLand page.